We had an inspection of the house on our return from Australia (in the rain) where there had been progress with the Solitex vapour barrier installation and all the sealing of the concrete on the outside with special polystyrene.
The scaffolding was all in place and a start had been made by the roofer with some of the flashings. The wire under the roof was also in place.
Thursday, 19 October 2017